Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | MF |
Model Number : | 15/17mm |
Certification : | ISO |
Price : | ~ |
Payment Terms : | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Ability : | 50000pcs/mouth |
Delivery Time : | 20~30days |
Continuous Single Member Type Formwork Threaded Tie For Higher Loads
Threaded Formwork Tie is made of a metal rod which is completely
threaded from one end to the other end. Matching with nuts and
washers on each end, makes us a tie system for concrete formwork.
Formwork Threaded Tie can be removed from hardened concrete if
plastic sleeve is provided around it. After hardening, the sleeve
is bonded with concrete and threaded tie can be removed and reused.
It can be used for higher loads, with two nuts on each end will be
better.
Specification of Continuous Single Member Type Formwork Threaded Tie For Higher Loads
Material:45# Q235 |
Diameter:12/15/18mm |
Surface Treatment:Origenal,Electric Galvanized |
Process: thread rolling |
Length: 1-6m |
Weight:1.5kg/m |
Inspection equipment:Breaking test machine,chemical analysis machine,faigue test machine,hardness test machine |
Packing:Wrapping film, standard export packing in bundle. |
Delivery time:20-25days after receiving pre payment |
Sample: Available |
OEM:Available |
FAQ:
1. Can i have a sample of Props Sleeve and nut? Yes, and sample is free.
2. How can i know how's my order going? Before you place order to us, we will tell you how many days it will needed according to the quantity. After we received the prepayment, production will start from the next day. Our salesman will update the production schedule to you on time.
3. Can you warranty your product? All our products will undergo inspection before delivery, make sure they all have good performance and quality. Our company also have after sales service, we will undertake our duty without hesitation.
4. What's your payment? T/T, 100% L/C at sight, Cash, Western Union are all accepted
![]() |